FULL RENOVATION FOR RESALE IN 4.5 MONTHS
City Walk, Building 9

City Walk, Building 9

TYPE
SIZE
LOCATION
OBJECTIVE
TIMELINE
YEAR
2-BEDROOM APARTMENT
145 SQ.M
CITY WALK
FULL RENOVATION FOR SALE
4.5 MONTHS
2025
  • Created a refined, high-end interior with a complete and cohesive feel
  • Apartment fully market-ready with no additional investment required
  • Enhanced first impression — a key factor in accelerating the sale
Результат
  • Full demolition of outdated finishes
  • Installation of large-format porcelain slabs and mosaic finishes in bathrooms
  • Complete replacement of plumbing and engineering systems
  • New kitchen and appliances
  • Replacement of wardrobe systems + walk-in closet
  • Home office created instead of the maid’s room
  • New flooring (parquet)
  • Added accent lighting and track lighting systems
  • Decorative wall finishes — stone textures and textured plaster
  • Door replacement
  • Full furnishing package: furniture, textiles, décor, and tableware
WHAT WAS DONE
  • A dynamic contemporary interior reflecting the energy of the location
  • Minimalism with bold details and character
  • Thoughtfully designed lifestyle scenarios for the spacious terrace
  • Maximum functionality throughout the space
CONCEPT
  • The space did not feel truly move-in ready
  • Lack of functional storage logic and clear living scenarios
  • The balcony was not integrated into the overall apartment experience
INITIAL CONDITION