RU
EN
FULL PROPERTY RENOVATION IN 3 MONTHS

Dubai Hills Acacia

Dubai Hills Acacia

TYPE
SIZE
LOCATION
OBJECTIVE
TIMELINE
YEAR
2-BEDROOM APARTMENT
120 SQ.M
DUBAI HILLS, ACACIA A
RENOVATION FOR RENTAL / SALE
3 MONTHS
2024
  • Interior aligned with modern market standards
  • Increased property value and investment appeal
  • Apartment sold with an ROI of 15.2%
RESULT
  • Bathroom finishes upgraded using large-format porcelain slabs
  • Full replacement of plumbing and boilers, with inspection of all systems
  • Complete kitchen replacement using natural stone
  • Updated wardrobe and storage systems
  • Flooring replacement (SPC)
  • Added decorative gypsum board architectural elements
  • Integrated additional lighting, accent lighting, and track lighting systems
  • Decorative plaster, moldings, and layered paint tones introduced
  • Interior doors refreshed (repainted)
  • Full apartment furnishing (furniture, textiles, tableware)
  • Custom-made upholstered and built-in furniture
  • Final styling and decoration
WHAT WAS DONE
  • A contemporary, versatile interior with an investment-driven approach
  • Focus on durability and visual clarity of the space
  • Layered lighting scenarios for different lifestyles and everyday needs
  • A balance between aesthetics and practicality
CONCEPT
  • Outdated finishes and wear in key areas
  • Engineering systems required upgrades and inspection
  • Kitchen and storage systems no longer met modern standards
  • The interior felt visually outdated and uncompetitive on the market
  • The goal was to fully upgrade the property and increase its market value
INITIAL CONDITION
Discuss Your Project
Westburry Tower 1, Office 301-110
Business Bay, Dubai, UAE
LAVE INC TECHNICAL SERVICES L.L.C.
Made on
Tilda